Zack asks—
When will there be a proper cycling connection between Cumberland and Brunette along E Columbia? Almost everyone rides on the sidewalk there.
I have no idea.
I’m not happy about that answer, that piece of terrible planning turned into infrastructure failure is one of the biggest active transportation pet peeves I have in the City. Now, I could blow smoke up your ass and say we are working on it, but I don’t actually think we are. And to understand why not is to understand what is currently frustrating me most about my job.
The Central Valley Greenway is a great piece of regional transportation infrastructure. After only the BC Parkway (which has its own frustrations), the CVG is the best integrated inter-community cycling and active transportation route in Greater Vancouver. Tracing pretty much the flattest and most direct route between Downtown Vancouver and the triple-point of Burnaby New West and Coquitlam, with a significant side-spur connecting to Downtown New West, the CVG is 24 km of relatively safe, pretty comfortable and pretty attractive cycling infrastructure opened to some fanfare in 2009.
It is definitely not perfect, and much of it falls far short of what we would consider “All Ages and Abilities” AAA bike routes. That in Burnaby they built a really great multi-use overpass at Winston and Sperling to cross the road and railroad tracks almost makes be forgive the adjacent 4 km where the route is a too-narrow, poorly-maintained and debris-strewn paint-demarked lane adjacent to a truck route where 4+ m lane widths assure the 50km/h speed limit is treated as a minimum. But I’m not here to complain about Burnaby, I’m here to complain about New Westminster.
At the time of the CVG opening in 2009, it was noted that some parts had “interim” treatments, and would be brought up to proper design in the near future. One of those is the section you mention, where the separated Multi Use Path (“MUP”) along East Columbia simply runs out of road room, and for 150m, cyclists are either expected to share sidewalk space with pedestrians (which is actually legal in this space, but that’s another Ask Pat) on a 6 foot wide sidewalk immediately adjacent to heavy truck traffic coming off on Brunette, or take a 360-m detour up a steep (13% grade!) hill to Sapper Street, then back down an equally steep hill a block later. It is a fudge, but tolerable as a temporary measure as we get this great $24 Million piece of region-defining infrastructure completed.
A decade later, the fudge is still there, and it is way less tolerable.
I have asked about this for pretty much a decade, and the answer seems to be that this fudge will get fixed when the intersection of Columbia and Brunette gets fixed. If you look at the traffic plan for Sapperton and the “Great Streets” section of our master transportation plan, you see that there is some notion that the Brunette/East Columbia intersection will work better if Brunette is made the through-route, and East Columbia is turned into a light-controlled T-intersection. This vision appears at times when discussing Braid and Brunette changes, or potential “solutions” to the United Braid Extension conundrum, or dreams of re-aligning the Brunette offramp from Highway 1 or the building of 6- or 8-lane Pattullo Bridges. When one or all of these things happens (so goes the story) then re-aligning this intersection will be an important part of “keeping things moving”, and then we will have the money/excuse/desire to fix the fudge in the CVG.
But none of those things have happened over the last decade, and there is really no sign that any of them are going to happen any time soon. There certainly isn’t any money in the City’s Capital plan to do this work, no senior government is offering money to do this work, and there is very little political will by anyone (for good reason) to spend tens or hundreds of millions of dollars shifting choke points for drivers around in New West around. So all this to say my answer to your first question is No, there is no foreseeable timeline to fix this piece of the CVG.
But my frustration is this being just one more example of how the City of New Westminster is has still not adopted the principles of our Master Transportation Plan and it’s clear prioritization of active modes. This is still not the culture of the organization. If the improvement of this keystone regional active mode route is contingent on us spending 10x the amount it would cost on some “getting cars moving” project that we can slip this in with, it is clear where our priories lie. As long as making an active transportation route work is still accessory to motordom, we are failing our own vision.
Hey Pat. Love your post. Brings back good memories of doing timed trials for this CVG project back in 200x. Luc R