Eric asks—
Ahoy Capt. Re: Das Sub
Great the Quayside playground is up for a needed rebuild. Has “what do we do with the submarine” come up?
After all this item has quietly slipped into historic artefact/ community heritage resource status.
We all know it came from Expo ’86. What might not be as well known: it was from a West Edmonton Mall attraction (at the time the mall had more working subs than the Cdn. navy); at Expo it was part of the brilliant public art piece Highway ’86 by James Wise of SITE, a cutting edge design firm all us young architects were in awe of.
The sub was the largest of dozens of transportation, including a tricycle and an aeroplane, all painted matte grey and set on an undulating grey asphalt “road”.
How about we hand the sub over to the Public Art Cttee. to reprise/resurface it in a new location? Our local transpo crowd – including a certain councillor- might get right into it.
Yes, the topic of saving or moving the semi-Sub has come up. Staff have even spent a bit of time looking at potential options. However, at the risk of sounding like a boo-bird, I need to point out some of the significant technical challenges staff have related to me about trying to save and/or move the Sub.
The Sub can’t stay where it is. The storm drainage pipe under it needs to be excavated and replaced, that is not an optional thing, but something the City needs to get done before compete failure of the pipe and related flooding. Try trying to remove the sub in one piece presents several challenges (not to mention the unknown unknowns, to borrow a phrase). It will need to be separated from the foundation built to support it, and the entire concrete-over-steel structure would have to be lifted and moved, which if not done with great care (read: expense) may end the entire “in one piece” part of the discussion.
The Submarine itself would need extensive restoration if it was to be made a permanent art installation, as the steel is not in great shape based on the concrete delamination and spalling – the piece was built for a 6-month installation 30 years ago. The modifications of it to install it in the park (removal of the wings, installation of the railing) probably didn’t help, nor did the various coats of paint that are now peeling off of, regardless is whether the concrete overcoast comes with it or not. We currently have no budget for, and have not even had evaluated, the form of this restoration, however safe to say it will be significant.
We have nowhere to put the submarine. If we remove it, we would need to find a place to store it where it can be protected from the elements, and where restoration work can happen. Unless a generous benefactor with spare warehouse space was to come along, I’m not sure where we can do this.
Finally, and this is, unfortunately, the biggest issue with all of the above – we have very little time to get the pipe replacement work done. As much of the drainage involves an excavation within the wetted area of the river, the work needs to be done within a “fisheries window” – a short period of time when Fisheries and Oceans Canada have given us permission to do the work in order to minimize the disruption of fisheries habitat and the injury of fish. Again, this is not something we have any control over, and that is creating a very, very tight timeline for the work, and it will be starting very soon. An extra week or two to design, coordinate and execute a potentially delicate removal plan for a piece we have no long-term plans for would be perilous. Never mind trying to find the (estimated – with significant contingency) tens of thousands of dollars to do the removal work.
As for the Heritage value, there already was a preliminary assessment of the Sub. The value is considered very limited and “sentimental”, but not representing a significant heritage artifact. Its provenance is not New Westminster, and it is separated from its context. Although there are legends about a connection to West Edmonton Mall, in reality the submarine was the only machine of the 200 that made up the Highway 86 installation that wasn’t a real, operating machine before it was installed. It is a semi-sub; half of a fake boat. The “U” in this U-boat stands for “Unecht”. You get the message.
That said, on kitsch value alone I’m not opposed to the idea, and wish we had more time to allow someone passionate about such a plan to cook up a solution to the above concerns. Problem is, this project has been discussed and on the books for many months (including a few public consultation rounds and public meetings), and the topic of saving the submarine has not been put forward as an important component of the engineering work or playground replacement. I also touched bases with a few people in the Publci Art realm, and they were… underwhelmed. Unfortunately, we are now well past the eleventh hour, and jeopardizing the timeline and budget of the planned work for the site at this point would be irresponsible.
So in sumary, I’m going to suggest this is an interesting idea, likely impractical, definitely costly, and probably undoable considering the pressures on the City to get the engineering work at the Quayside done. I would suggest the submarine is finally heasded off towards the sunny horizon it has pointed at for more than a generaiton: the metal recycling and junkyards south of the Fraser.
Make it so.