Ask Pat: Permit times

Someone asked—

I am a rental tenant at [redacted to protect privacy – a downtown Strata building]. I have heard our Strata is considering dissolution & sale of our building to developers. How long does a demolition process take per the City of New West’s permit(s) process etc.?

This is really not a question I can answer with certainty, because I am not involved with these kind of front-counter operations. The short version of your answer is that a Demolition Permit can probably take less than a day or several months (depending on things like the need for hazardous material surveys, Environmental Site Assessments, and safe disconnection from City utilities) but it isn’t the Demolition Permit timing that would necessarily be a limiting factor here.

It sounds like the feeling in your building is that the current building will be demolished and a replacement building built. I suggest that, if this was the case, a new owner would not apply to demolish the building until they had a certainty that they would be permitted to build a replacement on the site. That would likely require a Development Permit, and may even require a Rezoning or an Official Community Plan amendment, depending on what the owner wishes to build. The more of these you add, the more time it takes to get through the process. Those processes also include extensive public consultation, and would likely result in a Public Hearing. All told, these processes can take a year or more. The more complex the project and the more it varies from existing land use, the more complicated and time-consuming these applications go. It is also possible that a developer’s proposal will not be found acceptable by City Policy or by whim of Council, so the wait an be literally endless.

That said, I have no idea what process your building will have to go through, nor do I know what the new owner would plan to build. No application for your address has come to City Council yet. I did a quick scan of the Land Use and Planning Committee agendas for the last year, and don’t see it mentioned there at all (as a preliminary step, any application would likely go to LUPC before it came to Council). I also checked the on-line “Projects on the Go” table, and see no reference to your location, so I am pretty sure no formal application has been made to the City.

In researching your answer, I stumbled upon a report that I am a little reluctant to link to, because it was authored by an organization that has a long reputation of producing dubious reports using sketchy research methods. But for that it is worth, a third party with no reason to make a progressive city like New Westminster look good found that we are comparatively quick in getting new buildings through the approval process. They found that our staff and process are able to process applications faster than most Municipalities in the Lower Mainland: generally in the top 3 or top 5 in the region (depending on the application type). They also found we had among the lowest “Costs and Fees” for a typical application (those fees are ideally set to act as cost recovery). I started by saying I am somewhat separated from front-counter activities at the City, so none of this credit goes to me, but kudos to our great professional staff!

So, in summary, if you are curious about redevelopment plans for your apartment, keep an eye on the City’s LUPC Agenda and the “Projects on the Go” list. Also remember, as a renter, you have rights under the Residential Tenancy Act, including appropriate notice and compensation for being evicted. If you have questions, you should contact those professional staff in our Planning Department. They almost certainly know more than I do. Good luck!

TMH and the Public Hearing

We had a Public Hearing on Tuesday, and I have gnawed the ends off of a few metaphorical pencils thinking about how to write about it. Partly because it was an emotional night for a great many people, including members of Council. So I’ll start by talking about the facts, and save the emotions for after the fold.

The Public Hearing was to evaluate an OCP Amendment and Rezoning to permit the construction of a 44-unit supportive housing project on City land in Queensborough. This project is funded by the provincial government’s rapid response funding program, where capital and operational cost of a temporary modular housing (“TMH”) building will be covered by BCHousing, if a local government can provide land it owns (for a 10 year lease) and a reliable service agency agrees to operate the facility.

The City went through an extensive search for an appropriate site, and several sites were evaluated in Q’boro and other New West neighbourhoods. Of the three “short listed” sites, only the site at 838 Ewen Avenue was found to be viable. After some initial feedback from the community, we did some more evaluation of a second site in Queensborough, but again found it was not viable for reasons I discussed here. In short, if we wanted to take benefit of the rapid response funding, and have a TMH project in New Westminster, the Ewen Ave site is the only location.

Going into the Public Hearing, we received about 200 pieces of correspondence, and almost all of them were in favour. There was also an electronic petition circulated in the neighbourhood that opposed the project. The Design Panel, Advisory Planning Commission, and Community and Social Issues Committee all voted to support the project. I attended the public open house back on May 1, and heard concerns expressed by some residents, and also had some of my questions answered about the project. I had meetings with people who expressed specific concerns about the site, and the project in general, and also had many conversations with people who supported it, including many people who approached me at the Queensborough Children’s Festival two weeks ago. Along with other members of Council, I did a tour of the similar (but larger) TMH project in a residential Marpole neighbourhood that received significant public attention when it was proposed, but has been operating for more than four months without significant issues.

All this to say I had a *lot* of information going into the Public Hearing, but I was not sure what feedback we would receive, and only hoped for a rational and respectful conversation about concerns and benefits. In the end, we had about 80 people delegate to Council, with a majority in favour of the project. Even if we separate the presentations from the proponents (BCHousing and E.Fry), there were still as many community voices speaking in favour as opposed. That said, Public Hearings should not, in my opinion, be about raw counts of Pro vs. Con presenters, but should be about the weight of the arguments when seeking balance between benefits and costs of any project.

Fundamentally, this is a land use issue. The question before Council was whether this is an appropriate use of the land. This being the only piece of City land available does not by itself make it the right place for TMH. Every land use decision is about balancing positive and negative impacts, including opportunity costs. This lot was purchased by the City along with an adjacent piece of land a couple of years ago from the owners of the previous gas station on the site (demolished in 1991). It had recently been used as a construction staging and supply stockpile during the Ewen Avenue reconstruction, but is currently bare gravel. The location is close to the Queensborough Community Centre, adjacent to a bus stop with fairly regular service, and about 800m from major shopping. The service providers think the site is a good balance of being close to services but also in a residential area.

I am cognizant of the green space concerns, but do not see this project as a significant takeaway from Ryall Park. The lot is about 1,430 square metres, which is less than 2% of the Ryall Park area (when you include the Community Centre and adjacent playing fields, but not including the schools). Despite some comments I heard during the Public Hearing, Queensborough has more green space by area and per capita that the City’s average, made even more so with improvements over the last decade related to Port Royal Park, Old Schoolhouse Park, and greenway improvements along the waterfront. I am protective of the City’s green space, and agree that many neighbourhoods need more (which we are working on), but every discussion about green space is about balancing the opportunity costs and other community benefits.

A lot of the conversations and research over the last month has been around a “risk” argument – the argument that the residents of this housing will pose a greater risk to other park users than any other resident of a house or townhouse in the area. We met with BC Housing folks and reviewed the Community Advisory Committee and PAC minutes from the Marpole project and adjacent schools. We have talked to law enforcement and support agencies. We did everything we could to learn what the experiences in other locations were in relation to these concerns, talking to people who have dedicated their careers to providing assistance to people in need of housing. I could not find any evidence that this project will create some exceptional risk to neighbours or other park users. Quite the opposite, the evidence is ample that an amenity like this improves the lives of people in our community, and makes our entire community stronger.

Council each had their own reasons to support this project moving forward (and you can watch the video here, I don’t want to speak for others). For myself, I believe this is an appropriate location, the only location in New Westminster where this valuable amenity can be rapidly built, and I am convinced this project can and will be a positive for the entire community.


Now for the hard part.

This Public Hearing was soul-crushing. There is no other way to describe it. A week later, it is still causing me a mix of feelings, most of them negative. I cannot get over what was an overwhelmingly negative experience for every member of the public who attended – those in favour of the project, and those opposed. But I don’t know how we take a project that elicits so much emotion and provide outlets for people to speak from their hearts and their minds such that they feel heard or understood without the antagonism that was displayed. I believe in community consultation, and in representative democracy and responsible governance as a force for good… this was none of those, and I feel heartbroken about how the event unfolded.

One thing that was made crystal clear to me: the Public Hearing process is broken. This structure demanded by the Local Government Act is almost perfectly designed to create an 11th hour all-or-nothing us-vs-them divisive conflict event where opponents face off and speak past each other instead of providing a safe, inclusive, and collaborative conversation about the relative merits or costs of a project.

The structure is such that it makes it difficult for Council members (who must remain open minded through the process in order to act semi-judiciously in the ultimate decision making) to moderate the debate or pre-empt the conflict. Staff must balance on the razor’s edge of providing factual information about a project without appearing to be advocating for a project that must have had enough public policy merit to get as far as the Public Hearing. The delegates at any Public Hearing are almost exclusively people who feel strongly for the specific project, or are strongly opposed to it. This is evidenced by the fact that most Public Hearings are sparsely attended – you have to feel personally affronted to bother going out on a Monday night to speak at a boring public meeting. Of course, the stronger those feelings, the less likely one is going to accept or appreciate new data or varying opinions provided at the Public Hearing. And as it is always a last-minute winner-take-all debate, there is very little opportunity to learn, or discuss the larger policy implications that underlie a project, from affordable housing policy to transportation demand management to voluntary amenity contributions and urban design principles, because those are bureaucratic-sounding and technocratic solutions that are lost in the fog of parochial personal concerns and emotional battery. That is a terrible way to make decisions in a complex world.

I wish a week later I had suggestions, a model for a better way, but I don’t. I don’t know how to fix it. I don’t know how we have a more nuanced discussion with the general public about any new project that comes down the pike. I don’t know how we provide space for the somewhat-interested and potentially-benefiting to engage when so much of the space is taken up by the personally aggrieved. All I know is that the current model of the Public Hearing doesn’t work. As currently structured, it is an affront to representative democracy, a barrier to good decision making, and a terrible form of consultation. It divides at a time when we should be coming together. It needs to change.

Counting Lanes

The Canada Games Pool replacement project is moving along. We have just completed a second round of public consultation, and one group have taken this opportunity to encourage the City to do more than the initial concept plan that resulted from the work to date. As they spent some time delegating to Council and have got quite a bit of messaging in the media (social and otherwise), I figured I would write a bit about how we got here, and my understanding of the request.

A couple of years ago, this Council made the decision to replace the Canada Games Pool (CGP) with a modern facility instead of investing tens of millions of dollars in replacing end-of-life components of the existing building and mechanicals. This has led to a lot of work on planning for a new facility, from figuring out what the “program” of the new facility needs to be, what it will cost, where it will fit on the site, and other technical and financial considerations. This has included two lengthy conversations with the public and stakeholders.

There are a few points that constrain our opportunities here. Council agreed with strong advocacy in the community that the existing pool cannot be torn down until the new one is built – we cannot afford to have a lengthy period without the swim programs and other amenities that the CGP provides. It was also determined that replacing the late-life Centennial Community Centre (CCC) at the same time would provide worthwhile synergies and assure continuity of programming. Finally, an extensive analysis of locations around the City brought the conclusion that the existing location had many advantages, and that the cost of moving the pool to a different neighbourhood just didn’t make sense, financially or for the disruption it would cause.

This is recognizing another limit on the current site, in that the front parking lot of the current pool was built on the upper reaches of the Glenbrook Ravine, which was filled in the 1960’s, burying a regionally-important sewer line under it. We cannot build above that sewer line (due to Metro Vancouver owning a right of way that excludes any construction), and moving it would cost a significant portion of what a new pool costs, so that further constrains the site. However, preliminary design and architectural work demonstrates that we can fit a decent-sized (~115,000 square foot) facility on the site immediately to the south and west of the existing pool.

Another thing Council did was tour new pool facilities across the Lower Mainland. We visited the Edmonds Community Centre, the Hillcrest Community Centre, the Poirier Complex, the West Vancouver Community Centre, and more. We also had an extensive tour of the current Canada Games Pool. On all of these visits, we are able to talk to the operators and project planners to talk about what works, and what doesn’t. Most interesting was to discuss what they would do differently if they were to start a pool replacement project from fresh. A few of us even scheduled a visit to a larger pool facility in Gatineau when in Ottawa last year, and have been tracking new pool facilities across the region to understand who is doing what.

Of course there have been a tonne of conversations here in New West with the pool user community, and people who don’t currently use the pool, but might like to except for its lack of serving their needs. There was both formal consultation and more informal meetings with stakeholder groups (such as the Hyack Swim Club). A few of us on Council also went out and did a few days of door knocking in the neighbourhoods around the pool to better understand what people think about the current pool, what they know about the replacement plans, and to hear if the budget freaks them out.

I have to say the most consistent feedback I received was that the current pool is not as inviting to families and community use as other more modern facilities. Part of this is the somewhat aged structure (described by some as dank and stuffy), but also the lack of play space and the colder water temperature (which makes it better for competitive swimming) that makes it harder for families to enjoy the space together. We also had feedback that the gym was too small and not comfortable because it shared humid and warm airspace with the pool. We also heard from a significant user group that they loved the humid, warm gym environment. A very small number of people valued the diving towers and the water slide, but most wanted more flexible spaces. The value of the pool as a community amenity and the programs run by our recreation staff were a consistent theme, but when it came to details, there was a wide diversity of opinions. I have no idea who you are reading this, but I bet at least one point I raised above is something you disagree with, as is the reality of public consultation.

The process to filter through this feedback included working with an architect experienced in building these types of facilities and measuring out what different program components would add as far as square footage and cost. The cost part, of course, includes the cost to build the facility, but also a business case based on the needs of a rapidly growing community. This means determining the capacity of pools, changerooms, gym facilities and such needed to accommodate (increasing) anticipated users. The operational costs are put into context of the potential for revenue generation and revenue growth. New Westminster is a relatively small city with challenging infrastructure needs, and it became clear that the budget was going to drive part of this conversation – we are going to build the best pool we can, but simply cannot afford to build everything that everyone wants. We knew hard decisions were going to have to be made.

Amalgamating the public feedback and other data, and coming up with a program to fit as many needs as possible, was a challenging process. The report on the first round of consultation and the reasoning that led to the proposed program, can be read here. It is this program that the City took out for a second round of consultation last month, and we have yet to receive a report back at Council about the results of the consultation; that is the next step here.

This is the background to the Hyack Swim Club’s appearance at Council to delegate on their needs and desires for the pool. I don’t want to put words in their mouth, but the message was that the proposed program is inadequate for holding the scale of meets that they think we can attract. We could still hold regional meets up to the level that the current facility can host, but we could not host national-level meets that are currently only possible at Kamloops and Victoria. In the media (social and otherwise) this has been characterized as requiring the addition of two more lanes, which sounds pretty minor, but there are hints it is more than this. So I’ll take a bit of time to put some context around that specific issue, recognizing this is at topic I am still learning about, so I stand ready to be corrected.

One big decision in any new civic pool facility is – do you build a 25m or 50m pool? The emphasis on fitness and lap swimming, including the legacy of the Hyack Club, is the reason the City suggested a 50m pool instead of a 25m pool (or even two 25m pools, which would be similar in cost to the one large pool, but provide much more user flexibility, which is the decision Richmond made with the new Minoru complex project). The demand analysis described above suggested that New West could meet anticipated swim demand by building a 25m 10-lane pool and a secondary leisure pool. It is the legacy of competitive swimming at the pool that led to the alternative 50m pool plan being considered.

The current pool is 8 lanes, and the proposed program would also be 8 lanes, with 2.4m lanes. The proposal also includes a much larger leisure pool that can accommodate some lane swimming, but also have the amenities people come to expect from a community pool serving families and other leisure users. So, contrary to some social media reports, we are not proposing a smaller pool that we currently have, but one with a functionally-similar main tank, and a significant second tank. It is my understanding (and I stand to be corrected here, as I have some reading to do!) that the Hyack Swim Club’s request is not just for two more lanes, but a deeper main tank, a much larger secondary tank with potentially less family / leisure useability, a significant increase in deck space for stands, and perhaps some other functional changes. The full proposal needs to be evaluated for fit and cost (capital and operational).

If I was to express frustration about this process, it is that the competitive swimming community always advocates for 50m pools whenever a new pool is built, but there never seems to be a pool built that satisfies their needs. Hillcrest and Grandview are just two recent examples of 50m pools that were built to accommodate a vocal competitive swimming advocacy group, but are(according to the presentations we received at Council) inadequate for competitive swimmers. The proposals for the new Harry Jerome complex in North Vancouver is going through a very similar conversation today (note – that “editorial” in the newspaper is actually a paid-for sponsored ad, which is its own weirdness), and I hear from the recreation operators that there are simply too many 50m pools being built in the region.

In summary, the conversation is ongoing here in New Westminster, and it is great that the Hyack Swim Club has been working to inform Council about their needs. I have had some correspondence from them since the Council delegations, and they have provided me some reading material to review. I hope to gain some better understanding about the details and (importantly) the business case implications involved in meeting the Hyack Swim Club’s expectations while not compromising what the rest of the community wants from a recreation facility. This conversation is not at all a setback for the project, but a perfect example of why we do public consultation. Our goal is (as it always has been) to have a project definition ready for when the Federal and Provincial government open the application window for infrastructure grants, and though there has been no confirmation of that date, we are in a good place to work out these details in time to make the window.

More to come!

MC Podcast!

A couple of years ago, a few new City Councillors from “the suburbs” of Metro Vancouver were invited to take part in a City Conversation at SFU, a program that brings people together over a brown-bag lunch at SFU Downtown to talk Urbanism. It was fun, and got us all speculating over a beer about how we can find an excuse to do this again. Then someone (I think it was Mathew Bond) said “Podcast”.

Two years later, almost to the date, we have a Podcast! It’s called Metro Conversations, and you can listen to the first 6 episodes at iTunes and GooglePlay. But first a little context.

Our initial idea was to repeat the City Conversations model: 1-hour conversations with a small panel of subject matter experts with an intimate audience, facilitated by the Council of Four (myself, Mathew Bond, Kiersten Duncan, and Nathan Pachal). We record these conversations, and put them out as Podcasts.

We also thought we could fill the space by also sitting down occasionally for a “Metro Chat”, where just the four of us discuss an Urbanism topic. The idea here is that we are elected people who are not subject matter experts, but can provide a bit of a bridge between experts and people interested in what goes into making a more livable city. We also bring context from our local parts of the region, as Urbanism too often emphasizes the urban centre and that is where it is more easily embraced. As we will explore, it is around the edges that the benefits and impacts of modern city-making are really felt.

As will be readily apparent to listeners, we are not professional broadcasters, but we are passionate about our communities, and love to talk about Urbanist topics and how they impact our communities.

We have a half-dozen episodes up and running, and a couple in the can that we are working on as far as making them audible. This is our first try (we could even call it “Season 1”?) and are hoping to hear form people about what they like, what we need to do better, or what topics you want us to tackle if and when a Season 2 is organized. So please tune in, and let us know what you think by going to our Facebook Page and providing us feedback.

There are People to Thank:

SFU Public Square for the grant and their (paid!) interns for doing a bunch of the busy work and coordination that we simply would never have completed if you left it to four City Councilors who live all over the place and have full time jobs and long lists of commitments that make our working together on anything difficult. This was only possible through the Public Square.

Michael Alexander from the City Program at SFU for pulling us together and giving us the inspiration to try something different.

Random #NewWest peeps Wes Kinna (for masterfully helping with sound at live events), Stephen O’Shea (for creating a cool distinctive sound for intro/outro), and Christa MacArthur (for lending us her distinctively non-distinctive accent).

The Network Hub in New West, the District of North Vancouver, City of Langley, City of Port Coquitlam, and City of New Westminster for hosting spaces for us to hold conversations.

And all of our guests and audience members who made the live conversations work.

Ask Pat: Arenas

Jeremy asks—

What is the current usage rates of our arenas? I see calls for a third area, but I don’t know how often our current arenas are empty, or how many groups trying to book ice time would be unable to do so.

Simple answer is I don’t know, but my reflex answer is that our arenas are well used, rarely empty, but not bursting at the seams. As usual, that answer needs to be put into context of how the City plans and builds new and replacement facilities.

A new facility, be it a swimming pool, a skating rink, or a skate board park, has a capital cost (what it costs to build the thing on the day we build it and over the long term in upkeep and maintenance), and an operating cost (what it costs every year to keep the lights on, staff to maintain the ice and run programs in the facility). Those second costs can be small, like a skate park, which costs very little to maintain once built; or very high, like the old Canada Games Pool, which is a real energy and resources hog.

Conversely, many facilities earn revenue from pool or ice rentals and program fees, but it is almost a fundamental principle of public recreation facilities that the revenue never covers the capital and operational costs. For every person who walks into the Canada Games Pool to swim, take a fitness class, or drop heavy weights on the heads of change room occupants, the City subsidizes their visit by about $2. There is no financial model where a pool with services like the Canada Games Pool even breaks even on earned revenue (otherwise private business would be competing us out of the business, no?),  and models where private companies run ice rinks rarely provide a high level of programming without significant support from clubs and local governments. Many facilities, such as the library, the skate park, or a playground, earn little or no revenue, but are nonetheless important amenities to improve the quality of life of people in a community.

I mix all of these together because building a new facility is never a stand-alone decision. It is *always* about placing things in a priority, which means both understanding the (perceived and actual) demand, and recognizing how existing and new facilities impact your capital and operating budgets.

The demand part can sometimes be recognized by the public and user groups before it comes to the attention of Council, who ultimately hold the purse strings and have to make the priority call. However, lacking a very motivated special interest group, it is much more common that staff who operate these facilities recognize capacity issues or unmet need and bring these challenges to Council through strategic and budget planning. This is the situation with library upgrades, with the Canada Games Pool and Centennial Community Centre replacements, with the expansion of the Queensborough Community Centre, and with the decisions we have made to invest in more flexible (but much more expensive) turf field replacements.

Sometimes, those priorities get shuffled by events. A neighbouring community building a new pool or an event like the Arenex collapse can shuffle the deck, causing us to move priorities in order to assure our program needs are met, and to assure we have the capital flexibility to deal with unexpected needs when they occur. The Arenex is an example of something that we now have to add to our capital budget, and to our planning. The capital cost of its replacement is covered for the most part by insurance, but it still needs to be included in a budget, and we still need to take staff off of existing projects to go through the replacement planning, project management, procurement and design work to make sure we replace it with the right thing. Again, staff time is one more thing that has to sit in a priority list – what work do we delay to rush the replacement of the Arenex?

So back to answering your question. We have not heard from staff that there is a huge unmet demand for ice in the community or the region, at least not in comparison to other unmet needs that have been placed higher in the capital planning priority list. And they would know better than I would, as they are the ones managing the day-to-day resource needs of the community.

That said, with recent requests from some members of the public, Council has asked staff to do a bit of work and better define for us where a third sheet of ice (or other ice allocation improvements) fits on the capital plan priority list, and whether there is a compelling demand case for moving it up. This has to also include some analysis of where ice demand is regionally so we can better understand how the two new ice sheets on our border in Burnaby and two more sheets in Port Coquitlam will impact regional needs. So staff are going to add this work to their work plans, and prioritize it alongside ongoing work to support the Arenex programs and plan the replacement, getting the Canada Games Pool project ready for senior government grants, and all of the other capital works already in our plans. This is a responsible way to approach new capital funding requests, whether they come to us from staff’s understanding of need, or from a data-gathering petition at the beginning of an election campaign.

Ask Pat: DCC, MFA, WTF?

This is not a real “Ask Pat”, but I was recently shown this Facebook Post, and I asked the author if I could answer it at length on my blog. I think it provides a good opportunity to open up a bit of how municipal financing works, from my decidedly non-expert-but-required-to-learn-enough-to-make-decisions viewpoint, and (in a roundabout way) asks what I think is a fundamental question about financing municipal infrastructure.

So here’s a question I’ve been pondering for a while about the housing crisis. I’m not sure exactly when the Local Government Act was amended to change the way municipalities generate revenues to cover the cost of infrastructure to support growth. The current method is called Development Cost Charges (DCC’s).

In conversations with a retired city controller I learned that up to the implementation of DCC’s cities would issue Municipal Bonds to generate the funds needed to cover these costs, build the infrastructure and then taxpayers would collectively pay for the costs through tax payments. In the early 70’s the Province created the Municipal Finance Authority to streamline this process so that hundreds of small communities didn’t have to be floating bonds to generate their infrastructure capital they now have expertise and experience at the MFA.

All this changed with the enactment of provisions in the Local Government Act for DCC’s which are essentially prepaid taxes paid to municipalities to cover the costs of roads, sewer and water installations and parks associated with the new development whether that’s an addition to your house or a 50 storey condo development.

OK so what? Well now the purchase price of that newly developed housing unit comes preloaded with tens of thousands of dollars of prepaid taxes. For arguments sake let’s use $50K as a nice round number, please bear with me for this illustration. So your purchase price includes this $50K, which by the way the developer probably has to finance plus any profit margin the developer might add and so additional costs, but lets work with $50K for now. At 5% mortgage interest that increases monthly payments by about $290 and adds over $37,000 in additional interest to the mortgage. With me so far? Now let’s add property transfer taxes and these days for a lot of people government mandated mortgage insurance as well.
So we’ve transitioned away from publically financed infrastructure growth to growth financed by individual families. What used to be money borrowed at preferential interest rates through government Bonds is now financed by homeowners through their local BANKS, the same ones that continue to report record quarterly profits year after year after year.

So what about the cities. Well since 2008 Canadian Municipalities collectively have managed to sock away over $100BILLION IN CASH while continuing to press Federal and Provincial Governments for cash to help them cover the costs of their suppossed infrastructure deficits. It seems to me that while its easy to blame ‘foreign investors and speculators’, at least some of this crisis needs to be laid at the feet of our governments at every level.

My first impression is that this discussion conflates a couple of things, and that is leading to a bit of confusion. Here is my understanding of the relationship between DCCs, Municipal Bonds, and the MFA.

The idea behind DCCs is to charge the capital cost of infrastructure expansion to the persons who benefit from that expansion. DCCs are charged when there is growth in residential density (a 3-story building becomes a tower, a house becomes a set of townhouses), and are meant to assure that a fair share of the cost of building bigger sewer pipes, bigger water pipes, buying new parks space, etc. is covered by the new population that fills that density. The City charges a DCC based on the square footage of the new density, and presumably the developer passes that cost onto the purchaser of the property, who is the ultimate beneficiary of the new infrastructure. In New West, we have DCC Bylaws for Transportation, Water Supply, Sanitary Sewer, Drainage, and Parks.

At current rates, a new 1,000 sq ft apartment in Downtown New Westminster would include about $5,140 in DCCs. That would be $1,120 for Transportation, $60 for drainage, $250 for water, $430 for sanitary sewers, and $3,290 for Parks. Note than a brand new 1,000 square foot apartment in New Westminster sells for something over $700,000. If you believe that the cost of new housing is directly correlated to the cost of building it, then DCCs can be said to raise the cost of any single unit by much less than 1%. Although they cumulatively do a lot to reduce the cost of infrastructure upgrades for current residents, I don’t think DCCs are a significant cause of the current housing affordability crisis.

It is important to note DCC money is not thrown into general revenue, but is put into specific reserve funds and earmarked for defined projects under the category for which they are collected. This is fundamental to the DCC regulation – they must be spent on improving infrastructure above and beyond what would have been spent if the density was not permitted.

For obvious reasons, DCC money is not spent the day it is collected. A City is a complicated thing, and we cannot upgrade a section of sewer on a whim. Instead, we need to plan out years, sometimes decades, in advance so that all parts of the system work together. When collected, DCC money mostly goes into a reserve fund and is drawn out when the works happen. Sometimes we can borrow against a reserve fund (if the sewer needs to be upgraded today, but a DCC has not been collected yet and we are confident it will be collected in the near future), but even that is a bit deeper than we need to go here.

DCCs also don’t pay for all infrastructure upgrades. Even if there was no density increase in a City, we would have to replace your water lines every 50 years or so, pave your road every 10 years or so, etc. That money comes from property taxes (in the case of roads and parks) or part of your water/sewer bill (in the case of the pipes). We collect a little more in your water bill than it costs us to run the water system, and set that aside into those same reserves to pay for maintenance and upgrades of the system when they are needed. Alternately, we can pay for the upgrades when they come up by borrowing money, and charge future users that cost (plus interest). As you will see, we do a little of both based on what makes the most financial sense at the time.

That is how we can have both $120 Million in our reserves and $65 Million in debt. I hate using household finances as a model for explaining municipal finance (they are two very different things), but this is similar to having money in an RESP account at the same time as holding mortgage debt: we do it for rational reasons related to how the financial and taxation systems are designed. We didn’t invent global capitalism, but we operate within it. If you have an alternative system that more fairly distributes capital, send me your e-mail and I’ll subscribe to your newsletter!

This does raise what I think is the fundamental question about how we finance public infrastructure. If we want to build, say, a new $100 Million recreation complex, do we save up enough money to pay for it before we build it, or do we build it on debt and pay it off over time? There are compromises to both.

In the first case, everyone pays today into a reserve fund until we hit the number that we need to build the complex. It will take several years, and for all that time, the taxpayers of the City will be paying into the fund but not receiving the benefit of those payments until some point in the future when the complex is completed (if they still live in the City at that time). Is that fair to them?

In the second case, the complex gets built first, and the people who have an opportunity to benefit from that complex pay taxes for it while it is being used. Of course, they have to pay a little more this way because the debt needs to be serviced over the period of time it takes to pay it off. Is that fiscally prudent?

(It sounds to me like you would prefer more of the latter in the case of financing infrastructure related to new growth, as it would result in the City borrowing more from the MFA or Municipal Bonds and spreading the cost evenly among all taxpayers, whereas the former puts more burden on the new home purchaser which they would, presumably, borrow from a bank to finance. Please correct me if I got your argument wrong.)

There are other factors that need to be considered, and this is why most local governments do some combination of both. It matters what interest rate a local gov’t can earn on its reserves vs. what interest they pay servicing the debt. In this low-interest era, we may choose differently than back in the high-interest 70s. These rates are also related to your financial status: a City with $100 Million in the bank can get a lower rate than a City with $100 Million in debt. There are also significant complications local governments have to go through to borrow beyond their 5-year financial plan. Add to this uncertainties like inflation of construction cost and other capital needs that may pop up in the same time period. The practicality is that we sometimes need debt, and we benefit from strong reserves. 

I don’t want to get into the discussion here about us going to senior governments with hats in hand asking for their help in funding public infrastructure (this blog post is already much too long). However, I can summarize by saying local governments are responsible for the maintenance and upkeep of about 60% of public infrastructure in Canada, and we directly receive about 8% of all tax revenues. Without help from senior governments, little of your public infrastructure would be sustainable. The Infrastructure Gap commonly measured across Canada to be more than a hundred billion dollars is measured above our existing reserves; but I digress.

The Municipal Finance Authority is, essentially, a Credit Union. Local Governments can borrow money from the MFA at rates better than we can get from commercial banks, and we can save our reserves with the MFA and receive a pretty good return. Most years, New West makes a little more in interest on our reserves than we spend in interest on our debt (though market fluctuations obviously impact this equation). As you note, the MFA structure has largely replaced Municipal Bonds issued by individual Local Governments. In essence, the MFA issues Bonds on behalf of all its member Local Governments. I am really not an expert on this part of finance, but I would assume that the reason we use the MFA instead of issuing our own Bonds is that the interest rates the MFA can offer (because they are a large, diverse organization) is much lower than we would have to pay to make the Bonds attractive in this razor-thin investment market.

But perhaps more to the point, the Bonds vs. MFA issue is something completely separate from the DCC discussion. DCCs are taxation – they generate revenue for a Local Government. Bonds are simply debt instruments; they are loans which we would have to generate revenue (taxes) to pay back. This takes us right back to the fundamental question that we have already asked – when should a government collect the money to pay for new infrastructure? Before it is built, or after? In reality, we do a little of both, and use the financial instruments available to us under the Local Government Act to hopefully strike a fair and responsible balance between the needs of today and the needs of tomorrow.

Compromise

The existing Skate Park at Mercer Stadium is now closed, as the school district is busy building a high school on that spot. Recognizing this was coming, the City put some money in to the capital budget to build a replacement. The replacement will be bigger and more modern than the old skool bowl at Mercer, and it took more than year to work with the skate community and other stakeholders to figure out the best compromise between various potential locations. The best solution found was the old Arenex location at Queens Park, in an area of the park designated for “active recreation” in the Queens Park Master Plan.

As there was some community concern related to this location during the community and stakeholder consultation, staff did extra outreach, design and engineering work to specifically address the concerns raised by some existing park users. With this work done, they came to Council in Monday last to ask for the go-ahead to procure the works, in the hopes we can get the new facility in the ground this summer.

I received a lot of correspondence on this proposal. At least 60 e-mails, some in favour; most opposed. An online petition was circulated and apparently collected hundreds of signatures in opposition to the proposal though I have to note that I haven’t seen or been provided any such list. Frankly, I was dismayed by much of what I read in that correspondence. I’m not going to call anyone out by name here, but the quotes speak for themselves:

I am concerned about cadet safety and potential conflict that could arise between the cadets and skateboard park users

It will just lead to conflict between young people and theatre goers.

The theatre building will be a prime target for graffiti.

With the legalization of marijuana, the theatre faces the possible smell of skunk to the west

I believe having a skate park within Queens Park anywhere would be a detriment to the Park. It is a beautiful quiet family park and not suited to a skate park at all.

There are many (most) residents in new Westminster who would have it (the skateboard park) done away with if they could, so please do not create more ill will between your mature, working, VOTING citizens and youth.

To quote the staff report on the last round of Public Consultation “In summary the stakeholder’s concerns include personal safety for other park users, risk of vandalism, potential for bullying of youth aged members of some organizations, perceptions of noise generated at the site, potential for vandalism/ graffiti

I’ll talk about the noise concern further down, but before I get there, I have to admit that just reading this correspondence completely took me aback, and made it hard for me to remain objective. The narrative presented offers an archaic and uninformed attitude about roller sports. Skating (along with bmx/trials, scooting, blading) is a healthy, creative athletic activity enjoyed by youth and adults. Characterizing an entire group of recreation users as troublemakers not deserving of sharing in our parks use because they are vaguely threatening is, in short, offensive to my definition of community. So, to be really honest here, I probably went into Monday’s meeting with a frame of mind shaped by this, and that no  doubt influenced my decision making. But let’s step back a bit.


When planning for a facility like this, or any facility in a City Park, there is a lot of work done before we get to a meeting like last Monday. Staff, user groups, stakeholders, consultants, and Council have been working on this for more than a year. I appreciate people wanting to get engaged in a decision like this, but people joining at the 11th hour need to recognize that your new idea has most likely already been evaluated. The City evaluated every piece of available City-owned land between Grimston and Hume Parks, between (to borrow a phrase) 10th and the Fraser, for this facility, and none were perfect. However, I can confidently say, having been involved in this discussion for more than year, that all other options had more net negatives than the final proposed location. The proposed place was not the perfect place, it was the least non-perfect place. That is the reality of how a consultative City works – every decision is a compromise of least-perfect solutions.

That said, the proposed location was a good one, worthy of support.

In speaking to the Skate community, it was clear that by putting a roller sport facility (like any other facility primarily directed at youth) at front and centre in a public place, you not only show you are inviting that activity into your community, but you generate interest, curiosity, and engagement, and build the sport. We hear too much these days that youth have limited opportunity or interest in unstructured outdoor activity (or “getting off their screens”, in the parlance of the day). Roller sport are exactly the kind of creative, athletic, unstructured, knee-scabbing and dexterity-building activity we lament youth not doing enough of, yet we have adults here trying to marginalize the activity by wanting it put “somewhere else” where they don’t have to see, walk or even park near it. Sorry, that argument doesn’t work for me.

Knowing this issue was emerging, I have spent some time in the last little while dropping by the old Mercer skate bowl and the All-Wheel Park at the Queensborough Community Centre. Every time I went by there, there were users of a variety of ages, from 4 year olds on scooters to adults teaching their kids how to board. There were parents watching their kids be active and creative in the outdoors. None of them felt this was an unsafe place. I think all of them would be offended to hear they (and their kids) were being dismissed as threatening to other parks users. The New West Police and the staff at the Queensborough Community Centre were both consulted on conflict issues that we may need to mitigate if we move the facility to Queens Park, and both said, plain and simple, there are none. The City’s skate parks are not havens of hooliganism and trouble.

There is a reason for that. Rolling sports are not a fringe activity like it may have been 25 years ago. This is a mainstream sport. Its culture has evolved to one of creativity, community support, and partnership. When I found out that roller sports are going to be in the Olympics in 2020, and tried to square this with the non-competitive/cooperative nature of the community, it reminded me of something I noticed at the Winter Olympics this year. In the new Snowboard/Slopestyle/Cross type sports, there was a noticeably strong comradery in these sports. The person finishing fourth in the Skicross ran up to hug the gold medalist from another country; every slick run was rewarded by high-fives from competitors, every sick crash with a pat on the back or a hug. The kids today are different than us; dare I say better.

This was manifest in the correspondence I received in favour of putting the park in Queens Park. Again, no names:

Placing the new skate park in the centre of Queens Park would profoundly and positively impact the New West community and increase acceptance and diversity for youth in New West. I believe it is the responsibility of our Mayor and Council to practice inclusivity towards more unique recreational activities that are popular among our youth.”

“I believe that placing the skate park in Queens Park would demonstrate the city’s celebration of diversity as well as honouring positive activities. It would set an example for all of our youth to see adults value the well-being, health, and enjoyment of young people. Skate Parks are a beautiful place that may invite people across many different socioeconomic backgrounds in New West to enjoy being outside, and foster belonging within our community

Given the wide range of existing facilities and user groups within Queens’ Park, our community has demonstrated it’s belief in the importance of public spaces being fully inclusive of different expressions of arts, culture, leisure and recreation. This is an opportunity to welcome a new user group and demographic to Queen’s Park and enrich its uniqueness, while contributing to its cultural legacy

Now that I have disclosed by biases (and how they were developed as we went through this process), we can talk about the decision made on Monday.


There were some legitimate concerns raised about this site: most notably the potential for noise impacts on the Bernie Legge Theatre. Recognizing these concerns when raised by stakeholders, the City paused the process and hired an acoustical engineer to evaluate the impacts. The report acknowledged that the skate park would create noise, measured it, and evaluated two ways to mitigate it. If the skate bowl was oriented towards the north, and a berm were built on the south side, the noise of the park (and other significant ambient sounds such as whistles on the soccer pitch and traffic on McBride) would be abated, making the theatre actually quieter than it is now. Alternately, the City could invest a little money in providing some improvements to the theatre including weather stripping and solid-core doors, which would effectively reduce ambient noises and the skate park form impacting theatre operations. The report from staff recommended the City do both of these, to double the sound baffling effect to give the theatre patrons an extra measure of confidence. This proposal would have resulted in a quieter Bernie Legge Theatre experience than there is now.

There were also some concerns about parking and pedestrian circulation around the Theatre. Again, the report proposed designating parking spots adjacent to the skate park, and improving pedestrian flow and surfaces between the parking lot, the theatre and the Cadets building. The proposal would have actually improved the very things the stakeholders were concerned about.

So the location was good for the user group, the legitimate concerns raised by the stakeholders could be and would be mitigated at the cost of the City, actually resulting in a quieter theatre with better parking access and pedestrian amenities. I don’t know why I would vote against this proposal.


After hearing a dozen delegations at Council, however, a “compromise” location was proposed. I could not support it. Here is why.

After more than a year of work, and a concerted effort to evaluate all positive and negative impacts of different locations, finding a design that fits the space and takes advantage of a current unused and unprogrammed part of the park, and after delaying to hire professional engineers to develop scientifically-defensible mitigation measures to address legitimate concerns, Council came up with a knee-jerk “compromise location” 30-40m to the west where there is a grove of trees and old tennis courts (the actual location is a little vague), which we have asked Staff to move ahead with “if technically feasible”. To be clear – no-one in that meeting knew exactly what footprint we are talking about, and no-one has any idea what “technically feasible” means, or what compromises will need to be made to accommodate this plan.

This “compromise location” is clearly an ill-informed compromise. It is not (as it was touted at the meeting) a “win-win”. It was, in my opinion, a result of treating the wants and needs of one user group with lesser regard than the wants and needs of another group, even after significant efforts to address the concerns of that second group resulted in a well-developed strategy to address their valid concerns and then some. Make no mistake, there is a lot potential loss in this “win-win”.

We don’t know what the skate community lost yet. Best case scenario, only a couple more months of being without a facility to practice their recreation. Potentially, this may be a much longer time if engineering or other concerns pop up. The “if technically feasible” caveat is a vague and compromising one in the world of engineering, and a terrible piece of guidance for professional staff (technically feasible at any cost? Regardless of other impacts?). After more than a year of work, the vision developed will be unnecessarily delayed and potentially compromised because of a last-minute knee jerk reaction that received far, far less technical scrutiny or input from stakeholders and user groups. That is a terrible way to make decisions.

Even worse: The potential impact on non-skaters has now not been fairly assessed. What of the users of the tennis courts and picnic area that will now be removed? Honestly, we don’t even know if moving the Skate Park to this “compromise location” will make the noise impacts on the theatre better or worse. It is entirely possible (and quite likely) that an earthen berm would have deadened sound much better than an extra 30m in distance. We do not have any evaluation of the opportunity cost of the “compromise location”. Basically, we cannot demonstrate any actual benefit of this location to anyone, other than salving a vague feeling that “they” need to be kept further away from “us”.

Best case scenario, staff will not run into any problems shoehorning a well-developed plan into a “compromise location”, and after only a couple of months delay, we will get a fully functional park up and running. Best case scenario, the new location will not create unanticipated impacts on other users of the park that require further mitigation. I am an optimist, and I sincerely hope this best case is realized. But in the decision we made on Monday, and the way we made it, Council did nothing to assure this happens.

Ask Pat: Housing crises

R57 asks:

I’m the one who suggested replacing the Bosa harbour front proposal with reproductions of the ‘Argonath’, and that not enough concern has been shown for the Temple of Doom half concealed in the plans for the 618 Carnarvon development. Over the past couple of years I have documented on Twitter the ongoing development of both condo and rental towers in my immediate neighbourhood: the noise, disruption, destruction of heritage or historic buildings, and so on. Ultimately, however, the greatest impact is on affordability and security for low income people in the downtown core.

I live [near] the development of the Novare tower and the site of the now demolished Masonic Hall. Our building has been sold twice in the past two years. We have now been informed that we are to be evicted for ‘renovations.’ This is from the same landlord who told us, on buying the building, that he planned not to spend a single cent on its upkeep. So, it is very fine to say that revenue from the development of a condo tower–whose ultimate purpose is to make mountains of money for developers and speculators–will partially go into an affordable housing strategy–but what have you actually done?

The last I looked, the city has approved a 42 unit affordable development to go ahead, but that was two years ago. What else? My rough tally, of just the 618 development, and the pointless, unnecessary exercise in megalomania called Bosa Pier West, amounts to about a thousand luxury units, and real, affordable housing available today–zero.

I note that the 618 developers will pay a million dollar penalty for bending the height or density bylaws, is that correct? If that is so, and that figure is still insufficient to build a few affordable units, may I suggest dividing that sum into a hundred individual grants of $10,000 each, which should be sufficient to help stressed citizens to relocate elsewhere here and abroad, and start over? I would prefer Tuscany myself, but Malaysia may be more affordable on my pension.

That’s a bit of a joke, but not much. So, we all have to go somewhere in two months. Any suggestions?

This was sent as a comment on one of my regular Council Report posts a month or so ago, but it raises enough issues (outside of architectural criticism) that I thought it deserved a fuller response, so I redacted a few personal-identification parts, and included it here. That said, I recognize I don’t really have an adequate response, but am thankful for the opportunity to go on a long rant here about the “Housing Crises”.

There is a lot going on in the housing market regionally, and the days have passed when New Westminster – a little tucked away, a little gritty, a little bypassed – could avoid the worst of the affordability crisis. We should have seen it coming. I think we did see it coming as we went through the Official Community Plan process, but while some made the case for urgency at that time, I think our reaction was (with benefit of hindsight) a tepid one.

One complexity of the problem is demonstrated in the inherent dichotomy in your comments: new building around your affordable apartment is seen as part of the problem, and not part of the solution to the regional housing squeeze. I hear a lot more concern from people (notably those who already have secure housing) that there is too much construction in the City. The reality is that growth of the City is tracking along with the Regional Growth Strategy expectations set out more than a decade ago. If there is a difference, it is in that we are building more high-density units and are not building into our single-family neighbourhoods. That is another entire blog rant I’ll have to save for later.

The newest of construction is rarely the most affordable housing, but if we bring in new supply while protecting older supply, market forces *should* result in that older stock remaining more affordable in the medium term. Even this approach creates a bunch of other problems – people buy up the less affordable stock with the expectation that they can knock it down and replace it with a tower and make more money. This is one area of speculation New West has (up to now) been pretty successful at avoiding, and we have not seen a large number of affordable housing units replaced with unaffordable condos. That is by New Westminster policy, not coincidence.

What we have seen is an increase in “reno-vicions” – tenants being displaced as an owner renovates a rental building only to raise rents substantially (doubled or more) once the renovation is done. As a City, we have no regulatory ability to prevent this, but we have been advocating at the provincial level for changes to the Residential Tenancy Act to prevent this. We have also been investing a bunch of resources and time into making sure tenants know their rights when landlords act unethically, and to provide as much support as we can to people when they are displaced. This is an ongoing effort at the City.

Building new homes is a business, and without a reasonable expectation of profit, no-one is going to do it. The construction market right now is crazy, and every construction project is burdened with a significant amount of financial risk. This risk is alleviated by building what they know, by pushing density limits, and by developing a pre-sale market that itself feeds speculation and inflated prices. It’s a vicious circle. It is clear we cannot trust “the market” to fix the affordability problem when the market is a large part of the problem. We need new construction, but we need much more than that.

We also need a supply of new homes not relying on the profit motive to get built. Few charities have the resources to do this work, so that leaves government. The federal government (with by far the deepest pockets) got out of the house-building business back in the 80s around the time we signed a new Constitution Act that put housing in the provincial realm. Since then, we have had a succession of provincial governments, each less interested in building public housing than the previous one. Local governments like New Westminster simply don’t have the resources to do this work when we have less than 8% of the tax revenue of the larger governments, and have our own increasing demands for expanded services and pressing infrastructure needs.

The upshot is that there was virtually no “non-market” housing built in the lower mainland for a good 30 years. At the same time, population has exploded and market housing has gotten completely detached from our stagnant wages (Why is no-one challenging the Chambers of Commerce and Boards of Trade about wages stagnation? ah…I digress). in 2018, it isn’t only the unemployed and the working poor who can’t find housing, it is the “middle class” struggling to find a place to raise a family. Rental vacancies have been stuck under 1% for a decade, and parochial concerns oppose any expansion of housing density into established single family neighbourhoods.

This is not a simple housing crisis, this is a bunch of different and overlapping housing crises coming together in a perfect storm. It was 20+ years in the making, predictable and avoidable, but here we are now. After 2 decades of bullshit neo-liberal responses (“we just need to Build the Economy, so everyone can afford a bigger house!”), the situation has only gotten worse.

So enough whining, what do we do now?

First off, anyone who tells you there is a simple or quick solution is lying or ignorant; probably both.

Clearly, we need to start investing again in non-market housing, like we did in the 50s and 60s when our country and economy were growing. We need to get back into building purpose-built rental buildings, so people who cannot or don’t want to own have a variety of housing available to them at various cost and scales. We need to incentivise the building of more “family friendly” middle-sized housing, and those have to extend into our once- (and sometimes still-) sacred single family neighbourhoods. And we need density around major transit hubs and commercial areas like downtown New Westminster to relieve market pressure. We need to shift our economic incentives (taxation regime, mortgage system, etc.) so that owning a home to live in is easier but buying investment property offers relatively less return. We need to do all of these things, and more. And we need to start doing it with the urgency usually afforded to something called a “crisis”.

I’m not going to shy away from saying that New Westminster, as a City, has been a regional leader in housing policy and investment, punching well above our weight. We have literally thousands of purpose-built rentals coming on line in the next year or two, because we have created an incentive package that makes them financially viable to build. We have managed to hold the line on demolition of older and more affordable rental stock. We have region-leading Family Friendly Housing policy, so there are more 2- and 3-bedroom suites being built. We have worked with service agencies to support affordable housing projects (two on the go, one more in the pipeline) being built on our very limited supply of City-owned properties. We have included an affordable housing component in our Master-Planned Community Developments such as Victoria Hill, and our OCP does open up more opportunities for infill density and flexible development forms. We direct amenity money from new developments into an Affordable Housing reserve fund to provide capital assistance to affordable housing agencies. We employ staff who do housing outreach and step in where (frankly) senior governments have failed, and try to connect residents with housing in any form they need. The brutal reality is that none of this is enough, and we are up against our limits as a local government, both in the resources and in legal authority. We need help. Back to the word “crisis” again.

You make reference (I think) to the bonus density charges made for the project at 618 Carnarvon. That money wouldn’t go to general revenue in the City, but is directed to specific capital funds – 30% of it directly to an Affordable Housing amenity fund, the rest to Childcare, Public Art, and General Amenity Funds to support capital projects like the Canada Games Pool replacement and the Library renovation. The City recently increased the value of these charges (reflecting recent increases in real estate prices), but have not reviewed how we apportion those funds in a few years. It might be time to do that. But even if we took $1,000,000 from that fund, it would only pay for building maybe a half dozen affordable units, if we had a place to build them, and an operator to manage them. As a local government, we simply cannot do this alone, and need to invest our capital in supporting the efforts of others to leverage our contributions into larger things we cannot do on our own.

I am encouraged by the work being done so far by the new provincial government, and hope we can see some serious investment here in New Westminster, and across the region. First in emergency housing to assist the homeless and those facing imminent homelessness, then supportive housing for those whose income doesn’t get them shelter in our market. We need to re-invest in the Co-op Housing model that worked so well 30 years ago, and we need to curtail the speculation market. We need to do all of these thing, and more. It is hard to be patient when so many people are so precariously housed, but this government is essentially starting from scratch, as a policy vacuum has existed in this province for 30 years. It is going to take some time to catch up.

All this is a long way of saying I have little advice for you. You can contact the Tenant Resource Advisory Centre (links/number for them and more contact info can be found here) and find out what your rights are, and what assistance my exist for you and your neighbours. I wish I had better answers. 

It is sad that the Lower Mainland is becoming so unaffordable that dreams of escape are only partially jokes. I have several friends who have left New West in the last couple of years, and housing affordability was a primary motivation for them. Some of them I would describe as pillars of the community. Volunteers, community builders, current and future leaders: the people who make a city into a community. Instead of here, they will now be building community in Winnipeg, in Saint-Lazare, in the Interior of BC. It saddens when people who want to call New West home cannot find a home they can afford here. It also angers me. We need more people to be angry about this to create the political will to make change, and willing to speak out for that change.

PAL by another name.

Monday’s Council meeting included a Public Hearing on a notable project on Carnarvon Street. Although it didn’t get much media (social or otherwise) before the Public Hearing, it seems to be getting some now, and there was enough going on at the Public Hearing that I think it is worth some discussion here.

The proposal will bring a new 32-story tower to the downtown tower district with 204 market strata units. The residential building meets the City’s Family Friendly Housing policy by exceeding the minimum number of 2- and 3-bedroom units. The tower will have a 3-story pedestal which will house commercial storefront space and some amenity space, and a little bit of above-ground parking around the back (more on that later). The tower will share the pedestal with a second 8-story tower that will have 66 non-market rental units run by the Performing Arts Lodges Society (“PALS”), a charity that helps provide affordable housing for veterans of the performing arts industries.

Council received two pieces of correspondence in regards to this project, both expressing support. We had 6 people present at the Public Hearing, one expressing concerns that the affordable housing component was not broad-reaching enough, and one local business concerned about the name of the development (see below), and the rest speaking in support (including the proponent, and the president of the New West Arts Council), mostly emphasizing support for the affordable housing component.

The project meets the goals of the Downtown Community Plan, was approved by the Advisory Planning Commission and Design Panel, and appears to be well supported by the community. The project puts density adjacent to frequent transit service and within walking distance of most services. The location also means we can bring new density and affordable housing on line without displacing other low-cost housing.

As one delegate at the Public Hearing mentioned, this is clearly not the entire answer for affordable housing. Far from it. Our regional housing affordability crisis exists at every level: professionals not able to afford family-sized homes; working poor facing demo-viction and rising rents; people with barriers to traditional housing lacking adequate supports, it’s a mess. No single project can fix all of these. What this project does, though, is address one identified gap, and engage a not-for-Profit in helping with that. This project is similar in that sense to the two small affordable housing projects the City is supporting on City lands, each identifying a specific group in need of housing and a service agency taking on the charge to help operate that housing.

The PALS project helps people who have worked on building the cultural quality of our community, and recognizes that people working in the performing arts rarely have pension plans or stable retirement income. By providing space in our community for dozens of experienced actors, writers, dancers, singers, production designers, directors, choreographers (etc., etc.), we promise to enrich our community’s culture. They will be the story tellers, the teachers, the artists that support a vibrant cultural future in New West. I don’t think we can measure the positive impact that could have in our community.

I have expressed concern in the past about Carnarvon Street and its urban expression. I think the Plaza88 development does not address the street well, and is out of scale with the pedestrian space we want to have downtown. I am more enthused by the urban design of this project, as it is well articulated, includes an open public plaza area, and appears to provide lots of eyes on the street, as opposed to a large wall of parked cars behind screens.

At initial readings and again at Third Reading, some concern was raised by some of Council about the parking situation. Between resident and visitors parking, this project will have 275 parking spaces, most of them underground. That is more than one parking spot per unit in a building that is across the street from a SkyTrain Station and walking distance to all amenities. The cost of building these parking spots (which could be more than $60,000 a spot!) must shift the cost of the units in the building – both affordable and not. We need to question why we are spending so much finding warm dry spots for cars when we are struggling to afford warm dry spots for people.

The project was designed to meet the City’s parking minimums, and shifting the goalposts for the developer at this stage in the process would be pretty onerous, and potentially threaten the project. However, this has raised the conversation at Council that our downtown parking standards need an update if we hope to make housing more affordable and meet the goals of our Master Transportation Plan. This conversation will be ongoing, and I’d love to bend your ears for a few hours about it.

Finally, the marketing department of the developer has some work to do, as they had found a great name for the development that was, unfortunately, almost indistinguishable from the name of a young but established business on the same side of the street about a block away. The business owner came to delegate to Council and expressed support for the project (the Arts community supports their own!) but was worried about potential impact on her business. The City has no regulatory role on the naming of developments, and having a legal fight over Trademarks and registered business names will only enrich lawyers and take time. Both parties have had an initial and positive conversation, and felt confident that a compromise could be found, so Council asked that they find a mutually acceptable solution prior to the project coming back to Council for Adoption.

Overall, this project is a net positive. In my opinion there are significant benefits to the community: affordable housing that adds to the City’s cultural diversity, improved public spaces, DCCs, density bonus and VAC money that contributes to community amenities, family-friendly housing diversity, density near SkyTrain, and a refreshed area of downtown bringing supporting customers to our business district.

I just hope those lens flares don’t keep the neighbours up at night.

Innovation! Transportation!

Next week is Innovation Week in New West. It actually starts with an Opening Reception at City Hall this Friday night which should be off-the-hook (with free music and video presentations and a special Steel & Oak release!) If you are in the #NewWest #Twitterati, you probably know this already, but some of you may wonder: “What is Innovation Week? And what can it do for Me?”

Let. Me. Tell. You.

As part of New West’s Intelligent City initiatives, Innovation week is a showcase of how technology, innovation, and sharing information can make our City work better, can make us a stronger community, can make businesses more prosperous and residents happier. It is about strategically leveraging innovative ideas like the City’s award-winning Open Data portal with hardware like the BridgeNet fibre network to build a better and more equitable future.

Now I read that last paragraph, and it is all true, but it doesn’t really tell you what Innovation Week is, does it? Let me try again.

Innovation Week is a series of panel discussions, hands-on workshops, networking sessions, tours and activities all open to the public, and inclusive of all ages, experiences, and interests. There will be classes to teach kids about coding, a Hack-a-Thon for teams of coders to develop new tech, forum discussions about new ideas, chances for Tech start-ups and businesses of all sizes to connect with Private and Public funding sources to bring ideas to reality. All wrapped up in fun enough with arts and music to keep your mind fresh. Through the week, you will be given reasons to dream, and information and resources to make that dream work.

I will probably write again about more events (if I get time, or else I will live tweet from there!), but I want to call attention to two events in particular, as they are interesting (I think) to the entire region:

Metro Conversations is a talk series I have been helping to organize with council colleagues from other municipalities. Out Fifth Conversation will be on Tuesday the 27th in the evening on the topic of The Promise of Innovations in Transportation. But instead of just dreaming of autonomous vehicles and hyperloops and Tunnels, we are going to ask whether the technological promises addresses what we actually want from our Cities – safe streets, livable neighbourhoods, sustainable communities, social connections and equity. This will be a fast-paced hour-long conversation, free to attend, but you might want to register as we don’t have the biggest room.

As a bit of a primer: watch this video form 1958, and ask yourself, is this the community we want? And how does this differ from Elon Musk’s vision of tunnels and hyperloops “connecting” our community.

The second event I with broad regional appeal for people like me who care about Sustainable Transportation and how it interacts with City Planning will be the Transportation Forums on March 1st. I’d suggest you book the time off work and enjoy the entire day, but you really don’t want to miss the evening event, as Mobility Pricing is sure to be the hottest political topic in the Lower Mainland through the fall elections and into 2019.

The evening forum will feature the Chair of the Mobility Pricing Independent Commission, one of the most respected and outspoken Urban Planners in Canada, and an Economist who can unpack the idea of what “fairness” is when it comes to paying for our regional transportation infrastructure. The Mayor of New Westminster will moderate the discussion, and it is free to attend.

If you are like me, you may be interested but apprehensive about Mobility Pricing. I have engaged in TransLink’s “Its Time” consultations, and understand how Mobility Pricing works in Singpore and London and Helsinki, but am cognizant of the challenge we have in Vancouver setting up a system that fits our region, and can be politically supported by the broad interests of the region. I’m hoping this forum will answer some of the questions I have, and allow me to better engage with the proponents and critics of road pricing.

There is a tonne of other great stuff happening between February 23 and March 3. Please come out and support these events, and thanks the many sponsors who help lead these conversations in New West. That link again.